Designed for
Organisations with an existing site — dated, slow, hard to maintain or stuck in one language — that they have outgrown but cannot afford to break.
Strategy-led redesign and migration
03
A strategy-led rebuild for organisations whose current site no longer serves them. We audit what exists, keep what earns its place, rebuild the rest on modern foundations, and migrate with safeguards so nothing of value is lost in transit.
Discuss this projectDesigned for
Organisations with an existing site — dated, slow, hard to maintain or stuck in one language — that they have outgrown but cannot afford to break.
The problem
Most rebuilds start from a blank page and quietly discard years of content, URLs and accumulated search visibility. The old site gets treated as an embarrassment instead of a dataset. The result is often a prettier site that does less than the one it replaced.
The intended outcome
A rebuilt, tested, multilingual site on modern foundations, with legacy content and URLs mapped, redirected and verified — live without a gap in service.
Integrated scope
Deliverables
Service process
The audit is the first milestone and fixes the scope of everything after it. Rebuild length depends on how much of the old site survives the audit; the migration plan states the estimate and names the planned cutover date.
01
We inventory the current site: every page, URL, language and integration. The audit states plainly what is worth keeping, what is broken, and what the rebuild must not lose.
02
Content and redirects are mapped before design begins. Where it saves weeks of manual work, legacy pages are scraped into structured content — the approach running now on the BATD Academy rebuild.
03
The new site is built with AI coding agents on staged environments, with staging kept noindexed so search engines never meet half-finished work. Automated tests cover navigation, forms and language switching.
04
Redirects go live with the new site in one planned switchover. Every mapped URL is verified afterwards, and a support window covers anything the plan missed — the discipline that carried Alberr's platform from prototype to production.
The practice owns
You provide
Not included by default
Relevant proof
Five live client properties are linked from the work page—open them, click through them and inspect them. El-Sultan Web does not attach invented outcomes or borrowed metrics to any service.
See live client workProject fit
Twenty focused minutes: what you need built, in which languages, and what a prototype-first timeline looks like for it. If the project is not a fit for this practice, you will hear that plainly.
Book a project fit callInitial qualification only. Not a free audit or commitment to purchase.